In October of 2011, I purchased a Vans RV-8 "QuickBuild" experimental aircraft kit. This blog serves as my builders log and captures the major portions of the build process.
Sunday, May 4, 2014
Beringer Brake System
Installed the brake fluid reservoir to the firewall assembly. Fabricated the left and right brake lines and installed them to the brake line fittings. Installed the brake hoses.
No comments:
Post a Comment