Beringer Brake System

Installed the brake fluid reservoir to the firewall assembly.  Fabricated the left and right brake lines and installed them to the brake line fittings.  Installed the brake hoses.




Tuesday, April 1, 2014

Spring is here ;-) Tail wheel mount, Control, CHT & EGT Wiring Connections

Finally the WX broke so Mike and I were able to work on the plane again.  We've both agreed that the plane will be done by Oshkosh (just not sure which one but we aren't telling anyone that part when they ask which one).  

Davin and I worked on finishing up installation of the beautifully chromed tail wheel mount assembly.  Installed the tail wheel spring mount.  Reluctantly had to add six CS 4-4 pop rivets to the bottom of the rear bulkhead due to space constraints.

Davin Squeezing Rivets


Wheel Mount Assembly
Aft Bulkhead

Prop Governor Linkage



Lower battery bus

Mike mounted the control cables.  We also finished up the CHT and EGT wiring connections.

Thursday, January 30, 2014

Can it get any colder??? Ran Control Cables

Too cold!  

Ran the three control cables from the quadrant to the engine.  Will need to order a longer one for the throttle