In October of 2011, I purchased a Vans RV-8 "QuickBuild" experimental aircraft kit. This blog serves as my builders log and captures the major portions of the build process.
Monday, December 23, 2013
More Cold WX! Drilled Hole for Control Cables
Mike came out to the factory and
didn't get much done....too cold.
Drilled the holes in left gear tower for the control cables to pass
through. Didn't have the right size snap
grommets so they'll need to be ordered.
No comments:
Post a Comment