Mike came out to the factory and
didn't get much done....too cold.
Drilled the holes in left gear tower for the control cables to pass
through. Didn't have the right size snap
grommets so they'll need to be ordered.
In October of 2011, I purchased a Vans RV-8 "QuickBuild" experimental aircraft kit. This blog serves as my builders log and captures the major portions of the build process.
METAR KGAI 240155Z AUTO 31012G18KT 290V350 4SM SCT018 BKN026 OVC037 00/M04 A3017 RMK AO1=
Engine and Mounts Ready |
Fuel Injection Servo Linkage |