![]() |
| Engine and Mounts Ready |
In October of 2011, I purchased a Vans RV-8 "QuickBuild" experimental aircraft kit. This blog serves as my builders log and captures the major portions of the build process.
Sunday, November 17, 2013
ENGINE MOUNTING DAY!
ENGINE
MOUNTING DAY! Bill Hughes (A&P/IA)
was kind enough to come over and lend a hand mounting the engine. We had some trouble getting it maneuvered
into the mount then getting the alignment correct to get the mounting bolts in
properly. After some choice words of
encouragement (aimed at the engine) we had it mounted in about an hour.
Saturday, November 16, 2013
Engine Accessory Installation
- Attempted to mount the starter but the B&C starter will not fit with the fuel injection servo. Need to do some research on fitment.
- Mounted fuel hose between fuel pump and fuel servo.
- Mounted oil in and out lines for oil cooler.
- Removed magneto studs and attached new shorter studs for the P-Mags.
- Mounted P-Mags.
- Mounted the fuel injection servo.
![]() |
| Fuel Injection Servo Linkage |
Wednesday, November 13, 2013
Prep for Engine Mounting
Started prepping engine for
mounting. Mounted primary and back-up
alternators. Mounted propeller governor
and re-clocked control cable arm. P-Mags
will require shorter studs than the original impulse magnetos so determined
correct size and will order them.
Mounted control cable mounts and mixture arm to engine.
Tuesday, November 12, 2013
Firewall Mounts
Mounted heater valve on firewall. Attached fuel sensor hose to FW. Fabricated and mounted mount for fuel flow
transducer and mounted with hoses.
Attached engine mount to FW.
Monday, November 11, 2013
Firewall Pass-Throughs
Finished drilling holes in
firewall for pass-throughs. Mounted
control cable eyeballs and drilled out inserts to match control cable
diameter. Mounted alternator regulator
and starter relay.
Wednesday, October 2, 2013
Mounted Landing Gear Posts
Spent 2.0 hours mounting landing gear to the fuselage.
Rotated fuselage inverted so that the forward portion of floor panel was level laterally and longitudinally
Filed a radius on the corners of the gear legs so that they nested flush into the inboard main gear attach brackets.
Three outboard main bolts were inserted from inside fuselage vertical tunnel to facilitate ease of access during bold torque inspections. Attached brake line from the fuselage to the landing gear.
Rotated fuselage inverted so that the forward portion of floor panel was level laterally and longitudinally
Filed a radius on the corners of the gear legs so that they nested flush into the inboard main gear attach brackets.
Three outboard main bolts were inserted from inside fuselage vertical tunnel to facilitate ease of access during bold torque inspections. Attached brake line from the fuselage to the landing gear.
Tuesday, May 28, 2013
Pilot/PAX Headphones & AOA CPU Bracket
Subscribe to:
Posts (Atom)


