Finished drilling holes in
firewall for pass-throughs. Mounted
control cable eyeballs and drilled out inserts to match control cable
diameter. Mounted alternator regulator
and starter relay.
In October of 2011, I purchased a Vans RV-8 "QuickBuild" experimental aircraft kit. This blog serves as my builders log and captures the major portions of the build process.
Monday, November 11, 2013
Wednesday, October 2, 2013
Mounted Landing Gear Posts
Spent 2.0 hours mounting landing gear to the fuselage.
Rotated fuselage inverted so that the forward portion of floor panel was level laterally and longitudinally
Filed a radius on the corners of the gear legs so that they nested flush into the inboard main gear attach brackets.
Three outboard main bolts were inserted from inside fuselage vertical tunnel to facilitate ease of access during bold torque inspections. Attached brake line from the fuselage to the landing gear.
Rotated fuselage inverted so that the forward portion of floor panel was level laterally and longitudinally
Filed a radius on the corners of the gear legs so that they nested flush into the inboard main gear attach brackets.
Three outboard main bolts were inserted from inside fuselage vertical tunnel to facilitate ease of access during bold torque inspections. Attached brake line from the fuselage to the landing gear.
Tuesday, May 28, 2013
Pilot/PAX Headphones & AOA CPU Bracket
Saturday, April 27, 2013
NACA Vents, Antennas, Roll Servo, and Strobe Power Pack
Thursday, April 18, 2013
Thursday, April 11, 2013
Monday, April 8, 2013
Spent about two hours cleaning up the wiring in the tower so now it looks pretty. Next step is figuring out where the headset jacks will go and get those in.
Next steps – mounting the comm antennas, remounting the GTX33 higher so it slides out of the tray above the comm antenna, making a mounting bracket and mounting the Navworx behind the panel, then adding the grounding block/forest of tabs to the structure.
Subscribe to:
Posts (Atom)












